showing the pipe system with its many discharge points. The pipes had reinforced rubber corners as metal corners suffered from the highly abrasive material passing through them; about 300 tons of solids each day.
Views of the tailings pond
This material is held atGwasanaeth Archifau Conwy / Conwy Archive Service
- Reference
- GB 2008 CP64/35
- Dates of Creation
- n.d.
- Physical Description
- 1 item