Views of the tailings pond

This material is held atGwasanaeth Archifau Conwy / Conwy Archive Service

  • Reference
    • GB 2008 CP64/33
  • Dates of Creation
    • n.d.
  • Physical Description
    • 1 item

Scope and Content

showing the pipe system with its many discharge points. The pipes had reinforced rubber corners as metal corners suffered from the highly abrasive material passing through them: about 300 tons of solids each day.