Part 1: Operational feasibility of running a service for a base case option via the Chelsea line; an alternative option via the Battersea branch, and a combined service over a bifurcated route. Part 2: Operational aspects associated with infrastructure such as signalling, rolling stock and emergency escape/access philosophy.
Report on Operational Issues Affecting the Proposed South West-North East Express Metro Scheme - Volume 1 of 2
This material is held atTransport for London Corporate Archives
- Reference
- GB 2856 (NEW)LT000253/006
- Former Reference
- GB 2856 a/c337/018
- Dates of Creation
- 25 Sep 1996
- Language of Material
- English
- Physical Description
- 1 folder(s)
- Location
- TFL000359
Scope and Content
Access Information
Closed
26/09/2016
Closed for standard 20 years