Correspondence, memoranda, minutes of meetings and reports concerning the operation of British Rail train lines. Includes details of the proposed construction of the channel tunnel, changes to the lines' electric systems and the possible resiting of Fenchurch Street Station.
Railways: British Rail Lines
This material is held atTransport for London Corporate Archives
- Reference
- GB 2856 (NEW)LT000137/006
- Former Reference
- GB 2856 A0147/002
- Dates of Creation
- 28 Jun 1963-23 Jun 1981
- Language of Material
- English
- Physical Description
- 1 folder(s)
- Location
- TFL016217
Scope and Content
Access Information
Open