Insurance document outlining the criteria of cover required for the London Passenger Transport Board for work carried out by John Mowlem and Company Limited.
Contract for Construction of Up and Down Tube Extensions of the Central London Railway - Bow Road to Leyton
This material is held atTransport for London Corporate Archives
- Reference
- GB 2856 (NEW)LT000236/001
- Dates of Creation
- 23 Dec 1936-22 Dec 1939
- Language of Material
- English
- Physical Description
- 1 folder(s)
- Location
- TFL002352
Scope and Content
Access Information
Open