Scaffolding has been erected so that the height of the building can be raised.

This material is held atGwasanaeth Archifau Conwy / Conwy Archive Service

  • Reference
    • GB 2008 CP493/2
  • Dates of Creation
    • 1927 Dec 6
  • Physical Description
    • 1 photograph

Scope and Content

An impressive front and side arch has been constructed to form imposing entrances